+75
flamming_python
dino00
PhSt
hoom
The-thing-next-door
MiamiMachineShop
marcellogo
Gazputin
Hole
GunshipDemocracy
Labrador
verkhoturye51
kumbor
Rodion_Romanovic
mnztr
Luq man
Tingsay
T-47
DasVivo
Singular_Transform
Benya
miketheterrible
miroslav
walle83
PapaDragon
Isos
Big_Gazza
KomissarBojanchev
SeigSoloyvov
KiloGolf
Ned86
r3mu511
chicken
Rmf
AlfaT8
wilhelm
Dima
kvs
Book.
Mirlo
marat
JohninMK
sepheronx
George1
AyalaBotto
artjomh
franco
zidzu
Vympel
Cucumber Khan
ult
Honesroc
Battalion0415
T055
Mike E
Vann7
magnumcromagnon
Morpheus Eberhardt
navyfield
medo
xeno
Stealthflanker
Deep Throat
zg18
calripson
Austin
Viktor
TR1
TheArmenian
runaway
Cyberspec
GarryB
Robert.V
Admin
Russian Patriot
79 posters
Project 2038.0: Steregushchy Corvette
George1- Posts : 18338
Points : 18835
Join date : 2011-12-22
Location : Greece
- Post n°256
Re: Project 2038.0: Steregushchy Corvette
For Pacific Fleet build at least six corvettes of 20380 project will be built
sepheronx- Posts : 8548
Points : 8810
Join date : 2009-08-06
Age : 34
Location : Canada
- Post n°257
Re: Project 2038.0: Steregushchy Corvette
Is there any word for the other fleets to get the same? To make them economical and longevity, they need to build quite a few. Since Russia is in desparate need of ships and these smaller ships pack a massive punch, I think it would be ideal to concentrate building more of these for other areas too.
Isos- Posts : 11312
Points : 11282
Join date : 2015-11-06
- Post n°258
Re: Project 2038.0: Steregushchy Corvette
Is it possible to integrate a naval version of the kh-31 to teregoushchy corvettes ? It has almost the same size of the Uran.
Does someone has the cost of the Molnyia bought by India (the one with 16 Urans) ?
If they are used with other Molnyia equiped with Moskits, 1-2 Steregoushchy and 1-2 grigorovich frigate, it would be a very powerfull task force even against US navy. They should propose task force for the export market insted of ships "alone". I'm sure countries like India, algeria and vietnam would be interested.
Does someone has the cost of the Molnyia bought by India (the one with 16 Urans) ?
If they are used with other Molnyia equiped with Moskits, 1-2 Steregoushchy and 1-2 grigorovich frigate, it would be a very powerfull task force even against US navy. They should propose task force for the export market insted of ships "alone". I'm sure countries like India, algeria and vietnam would be interested.
GarryB- Posts : 39093
Points : 39589
Join date : 2010-03-30
Location : New Zealand
- Post n°259
Re: Project 2038.0: Steregushchy Corvette
Actually isn't India and Russia creating a modified version of Brahmos that is smaller and lighter and can be carried by a wider range of aircraft platforms... and is faster.
Bung a huge solid rocket booster to get it airborne and you have a much better anti ship missile for light naval vessels.
The Kh-31 lacks weight range range from a ground stationary start... not so important for the Kh-35 as it is much slower but has a bigger warhead... (90kg for Kh-31 and 145kg for Uran).
Bung a huge solid rocket booster to get it airborne and you have a much better anti ship missile for light naval vessels.
The Kh-31 lacks weight range range from a ground stationary start... not so important for the Kh-35 as it is much slower but has a bigger warhead... (90kg for Kh-31 and 145kg for Uran).
Isos- Posts : 11312
Points : 11282
Join date : 2015-11-06
- Post n°260
Re: Project 2038.0: Steregushchy Corvette
GarryB wrote:Actually isn't India and Russia creating a modified version of Brahmos that is smaller and lighter and can be carried by a wider range of aircraft platforms... and is faster.
Bung a huge solid rocket booster to get it airborne and you have a much better anti ship missile for light naval vessels.
The Kh-31 lacks weight range range from a ground stationary start... not so important for the Kh-35 as it is much slower but has a bigger warhead... (90kg for Kh-31 and 145kg for Uran).
Yes I know but the design of Moskit and Kh-31 is so agrassive and beautifull ... It's cheaper too. They give a better disign to the ship, now with VLS they have all the same disign. An Udaloy II is so much cooler than a tico or a gorshkov.
GarryB- Posts : 39093
Points : 39589
Join date : 2010-03-30
Location : New Zealand
- Post n°261
Re: Project 2038.0: Steregushchy Corvette
Not to disagree with you, but you do realise that by talking about Moskit and Kh-31 you are covering most of the field in terms of rocket ramjet powered anti ship missiles...
Both Kh-31 and Moskit are from the 1980s... Kh-31 being a mach 3 600kg missile for tactical aircraft, while Moskit is a 4.5ton mach 2.5 very heavy missile first carried by Sovremmeny class destroyers as well as a surface effect ship and a missile patrol vessel.
The thing is that the Moskit was replaced by Onyx and Brahmos is a modification of the Yakhont which is the export model of Onyx.
A Brahmos-M would be an ideal substitution for Moskit as it is much smaller and lighter and faster and longer ranged... in fact the only better option would be the Zircon because it is a scramjet powered mach 7-8 missile but it isn't ready yet...
Both Kh-31 and Moskit are from the 1980s... Kh-31 being a mach 3 600kg missile for tactical aircraft, while Moskit is a 4.5ton mach 2.5 very heavy missile first carried by Sovremmeny class destroyers as well as a surface effect ship and a missile patrol vessel.
The thing is that the Moskit was replaced by Onyx and Brahmos is a modification of the Yakhont which is the export model of Onyx.
A Brahmos-M would be an ideal substitution for Moskit as it is much smaller and lighter and faster and longer ranged... in fact the only better option would be the Zircon because it is a scramjet powered mach 7-8 missile but it isn't ready yet...
George1- Posts : 18338
Points : 18835
Join date : 2011-12-22
Location : Greece
- Post n°262
Re: Project 2038.0: Steregushchy Corvette
Recent photos of the project 20385 corvette "Gremyashchy"
http://eagle-rost.livejournal.com/598792.html
http://eagle-rost.livejournal.com/598792.html
PapaDragon- Posts : 13291
Points : 13333
Join date : 2015-04-26
Location : Fort Evil, Serbia
- Post n°263
Re: Project 2038.0: Steregushchy Corvette
George1 wrote:Recent photos of the project 20385 corvette "Gremyashchy"
http://eagle-rost.livejournal.com/598792.html
They seem to be installing different mast (from 22350 it seems) or I might be wrong, don't speak lingo...
http://nortwolf-sam.livejournal.com/1136592.html
George1- Posts : 18338
Points : 18835
Join date : 2011-12-22
Location : Greece
- Post n°264
Re: Project 2038.0: Steregushchy Corvette
The newest corvette "Gremyashchy" will be launched in 2017
JohninMK- Posts : 14770
Points : 14907
Join date : 2015-06-16
Location : England
- Post n°265
Re: Project 2038.0: Steregushchy Corvette
[quote="PapaDragon"][quote="George1"]Recent photos of the project 20385 corvette "Gremyashchy"
Barely able to look out of a US Zumwalt.
Like the picture window size portholes. All they need is a veranda and a few deck chairs, perfect for watching a missile launch.
They seem to be installing different mast (from 22350 it seems) or I might be wrong, don't speak lingo...
Barely able to look out of a US Zumwalt.
George1- Posts : 18338
Points : 18835
Join date : 2011-12-22
Location : Greece
- Post n°266
Re: Project 2038.0: Steregushchy Corvette
Latest composites will make the Russian corvettes and frigates invisible
Подробнее на ТАСС:
https://translate.googleusercontent.com/translate_c?depth=1&hl=en&rurl=translate.google.com&sl=auto&tl=en&u=http://tass.ru/armiya-i-opk/2690570&usg=ALkJrhj3y5X7YwI1_4DjZVqHDn7UvV7y1Q
Подробнее на ТАСС:
https://translate.googleusercontent.com/translate_c?depth=1&hl=en&rurl=translate.google.com&sl=auto&tl=en&u=http://tass.ru/armiya-i-opk/2690570&usg=ALkJrhj3y5X7YwI1_4DjZVqHDn7UvV7y1Q
Isos- Posts : 11312
Points : 11282
Join date : 2015-11-06
- Post n°267
Re: Project 2038.0: Steregushchy Corvette
http://www.expressen.se/nyheter/ryska-militarfartyg-hotade-smhi-forskare/
Idk if it was already posted but nice pictures (from 2014) of a Steregushchy with Ka-27 on it, intercepting a dannish reseach vessel. Idk what's writen in the article.
Idk if it was already posted but nice pictures (from 2014) of a Steregushchy with Ka-27 on it, intercepting a dannish reseach vessel. Idk what's writen in the article.
PapaDragon- Posts : 13291
Points : 13333
Join date : 2015-04-26
Location : Fort Evil, Serbia
- Post n°268
Re: Project 2038.0: Steregushchy Corvette
Another 20380 corvette will be laid in July 2016 at Almaz shipyard. Name is "Reskiy" ("Резкий")
http://flotprom.ru/2016/%D0%9E%D0%B1%D0%BE%D1%80%D0%BE%D0%BD%D0%BA%D0%B072/
TheArmenian- Posts : 1880
Points : 2025
Join date : 2011-09-14
- Post n°269
Re: Project 2038.0: Steregushchy Corvette
PapaDragon wrote:
Another 20380 corvette will be laid in July 2016 at Almaz shipyard. Name is "Reskiy" ("Резкий")
http://flotprom.ru/2016/%D0%9E%D0%B1%D0%BE%D1%80%D0%BE%D0%BD%D0%BA%D0%B072/
Correction:
That vessel is going to be laid down in Amur shipyard in the far East. It is an Almaz design.
George1- Posts : 18338
Points : 18835
Join date : 2011-12-22
Location : Greece
- Post n°270
Re: Project 2038.0: Steregushchy Corvette
So we have in building process:
2038.1
Komsomolsk Shipyard, Komsomolsk-on-Amur
Sovershennyy, Laid: 30 June 2006 - Pacific Fleet
Gromkiy, Laid: 17 February 2012 - Pacific Fleet
Aldar Tsydenzhapov, Laid: 22 July 2015 - Pacific Fleet
Reskiy, Laid: July 2016 - Pacific Fleet
Severnaya Verf, St. Petersburg
Retiviy, Laid: 20 February 2015
Strogiy, Laid: 20 February 2015
20385
Severnaya Verf, St. Petersburg
Gremyashchy, Laid: 2 Feb 2012 - Northern Fleet
Provornyy, Laid: 25 July 2013 - Northern Fleet
2038.1
Komsomolsk Shipyard, Komsomolsk-on-Amur
Sovershennyy, Laid: 30 June 2006 - Pacific Fleet
Gromkiy, Laid: 17 February 2012 - Pacific Fleet
Aldar Tsydenzhapov, Laid: 22 July 2015 - Pacific Fleet
Reskiy, Laid: July 2016 - Pacific Fleet
Severnaya Verf, St. Petersburg
Retiviy, Laid: 20 February 2015
Strogiy, Laid: 20 February 2015
20385
Severnaya Verf, St. Petersburg
Gremyashchy, Laid: 2 Feb 2012 - Northern Fleet
Provornyy, Laid: 25 July 2013 - Northern Fleet
Last edited by George1 on Wed Apr 20, 2016 5:53 am; edited 1 time in total
marat- Posts : 352
Points : 348
Join date : 2015-04-26
- Post n°271
Re: Project 2038.0: Steregushchy Corvette
When Amur SY will finally finish Sovershennyy? They need 10 years and ship isnt ready jet....
PapaDragon- Posts : 13291
Points : 13333
Join date : 2015-04-26
Location : Fort Evil, Serbia
- Post n°272
Re: Project 2038.0: Steregushchy Corvette
marat wrote:When Amur SY will finally finish Sovershennyy? They need 10 years and ship isnt ready jet....
Agreed, they really need to sort out this mess with corvette production. This entire series is already obsolete and freakin' Gosrhkov frigates are being built lot faster than these corvettes at only slightly higher price. To say nothing of Grigorevich class.
Finish this series, start new models and mind the deadlines FFS...
medo- Posts : 4342
Points : 4422
Join date : 2010-10-24
Location : Slovenia
- Post n°273
Re: Project 2038.0: Steregushchy Corvette
Now with engine problem solved for 20385 corvettes, I hope they will order more for Northern fleet. I like them more than original Steregushy corvettes as they are armed with UKSK launchers and Kalibr cruise missiles.
TheArmenian- Posts : 1880
Points : 2025
Join date : 2011-09-14
- Post n°274
Re: Project 2038.0: Steregushchy Corvette
medo wrote:Now with engine problem solved for 20385 corvettes, I hope they will order more for Northern fleet. I like them more than original Steregushy corvettes as they are armed with UKSK launchers and Kalibr cruise missiles.
There won't be any more Gremyashy (pr. 20385) corvettes other than the 2 that are building at Severnaya Werf (St. Petersburg). Reason: they cost almost as much as an Admiral Gorshkov class frigate.
On the other hand there will be more Pr. 20380 class corvettes coming from the Far -East. 3 are being built there currently with a fourth one to be laid out in June 2016.
As for Severnaya, it is still unsure what they plan to build next. They may continue with 20380 or the newer version (20386). They could also stop corvettes altogether and concentrate on the Gorshkov class frigates. Currently they have 2 more 20380 corvettes building (apart from the two 20385 mentioned above).
medo- Posts : 4342
Points : 4422
Join date : 2010-10-24
Location : Slovenia
- Post n°275
Re: Project 2038.0: Steregushchy Corvette
TheArmenian wrote:medo wrote:Now with engine problem solved for 20385 corvettes, I hope they will order more for Northern fleet. I like them more than original Steregushy corvettes as they are armed with UKSK launchers and Kalibr cruise missiles.
There won't be any more Gremyashy (pr. 20385) corvettes other than the 2 that are building at Severnaya Werf (St. Petersburg). Reason: they cost almost as much as an Admiral Gorshkov class frigate.
On the other hand there will be more Pr. 20380 class corvettes coming from the Far -East. 3 are being built there currently with a fourth one to be laid out in June 2016.
As for Severnaya, it is still unsure what they plan to build next. They may continue with 20380 or the newer version (20386). They could also stop corvettes altogether and concentrate on the Gorshkov class frigates. Currently they have 2 more 20380 corvettes building (apart from the two 20385 mentioned above).
20385 is for northern fleet, while 20380 is for Baltic fleet. With 2 more 20380, which are now in the process of building in Severnaya will bring full number of 6 corvettes for Baltic fleet. Pacific fleet will also get 6 20380 corvettes. Role of Gremyashy corvettes in Norhtern fleet will be different than the role of Gorshkov frigates and considering the importance of Northern fleet, they need 6 of them to protect brown water area, while Gorshkovs will form blue water fleet.
TheArmenian- Posts : 1880
Points : 2025
Join date : 2011-09-14
- Post n°276
Re: Project 2038.0: Steregushchy Corvette
medo wrote:TheArmenian wrote:medo wrote:Now with engine problem solved for 20385 corvettes, I hope they will order more for Northern fleet. I like them more than original Steregushy corvettes as they are armed with UKSK launchers and Kalibr cruise missiles.
There won't be any more Gremyashy (pr. 20385) corvettes other than the 2 that are building at Severnaya Werf (St. Petersburg). Reason: they cost almost as much as an Admiral Gorshkov class frigate.
On the other hand there will be more Pr. 20380 class corvettes coming from the Far -East. 3 are being built there currently with a fourth one to be laid out in June 2016.
As for Severnaya, it is still unsure what they plan to build next. They may continue with 20380 or the newer version (20386). They could also stop corvettes altogether and concentrate on the Gorshkov class frigates. Currently they have 2 more 20380 corvettes building (apart from the two 20385 mentioned above).
20385 is for northern fleet, while 20380 is for Baltic fleet. With 2 more 20380, which are now in the process of building in Severnaya will bring full number of 6 corvettes for Baltic fleet. Pacific fleet will also get 6 20380 corvettes. Role of Gremyashy corvettes in Norhtern fleet will be different than the role of Gorshkov frigates and considering the importance of Northern fleet, they need 6 of them to protect brown water area, while Gorshkovs will form blue water fleet.
Agreed.
However, some time ago the Navy mentioned that they don't want more 20385. They just are too expensive for the role you mentioned.
medo- Posts : 4342
Points : 4422
Join date : 2010-10-24
Location : Slovenia
- Post n°277
Re: Project 2038.0: Steregushchy Corvette
TheArmenian wrote:medo wrote:TheArmenian wrote:medo wrote:Now with engine problem solved for 20385 corvettes, I hope they will order more for Northern fleet. I like them more than original Steregushy corvettes as they are armed with UKSK launchers and Kalibr cruise missiles.
There won't be any more Gremyashy (pr. 20385) corvettes other than the 2 that are building at Severnaya Werf (St. Petersburg). Reason: they cost almost as much as an Admiral Gorshkov class frigate.
On the other hand there will be more Pr. 20380 class corvettes coming from the Far -East. 3 are being built there currently with a fourth one to be laid out in June 2016.
As for Severnaya, it is still unsure what they plan to build next. They may continue with 20380 or the newer version (20386). They could also stop corvettes altogether and concentrate on the Gorshkov class frigates. Currently they have 2 more 20380 corvettes building (apart from the two 20385 mentioned above).
20385 is for northern fleet, while 20380 is for Baltic fleet. With 2 more 20380, which are now in the process of building in Severnaya will bring full number of 6 corvettes for Baltic fleet. Pacific fleet will also get 6 20380 corvettes. Role of Gremyashy corvettes in Norhtern fleet will be different than the role of Gorshkov frigates and considering the importance of Northern fleet, they need 6 of them to protect brown water area, while Gorshkovs will form blue water fleet.
Agreed.
However, some time ago the Navy mentioned that they don't want more 20385. They just are too expensive for the role you mentioned.
True, but situation now has changed. They have domestic engines for Gremyashy corvettes, but not yet for Gorshkovs. Gremyashy is now fully domestic ship and not much weaker than Grigorovich frigate and could be built in Far East as well. In the mean time, when Saturn will build new domestic engines for both Gorshkov and Grigorovich frigates, they could concentrate to build more Gremyashy corvettes. Why waisting time and waiting few more years forbuilding ships, when Steregushy and Gremyashy corvettes have their domestic engines and could be build without problems with supplies. Navy simply need new ships.
PapaDragon- Posts : 13291
Points : 13333
Join date : 2015-04-26
Location : Fort Evil, Serbia
Does anyone know what happened with Tiger class corvette concept? It was shown on Naval expo in St. Petersburg last year, it is supposed to be based on Gremashi class.
George1- Posts : 18338
Points : 18835
Join date : 2011-12-22
Location : Greece
- Post n°279
Re: Project 2038.0: Steregushchy Corvette
'Red' Corvette: Russia Ready to Install Engines in Its New Stealth Warship
The Gremyashchy, a sophisticated new Russian naval ship, will be equipped with domestically made engines, according to the press service of the Russian Defense Ministry.
The Project 20385 Gremyashchy corvette will get the engines before the end of May 2015, according to the Ministry.
The Russian Navy had previously planned to equip the corvette with engines produced by the German company MTU. However, like dozens of other contracts with companies from countries which imposed sanctions against Russia in 2014, these plans were scrapped.
With the four engines due to be transported to the Gremyashchy by the end of May, the warship's state trials will begin in 2017, according to the Russian newspaper Rossiyskaya Gazeta.
This multi-role ship is being built at St. Petersburg's Severnaya Verf Shipyard; it is designed for antisubmarine and surface warfare as well as for supporting land operations. The vessel is made of composite materials and incorporates stealth technology, which has considerably reduced its radar and infrared signatures.
The Gremyashchy has a crew of 99 and is equipped with artillery, missile and anti-submarine weaponry, as well as an advanced radar sytem.
Its armaments include Kalibr-NK universal missiles, a Redut anti-aircraft missile system and a A-190-01 100mm gun. It also has a hangar for operating a Kamov Ka-27 antisubmarine warfare helicopter.
The 104-meter-long corvette has a full displacement of 2,200 metric tons and a maximum speed of 27 knots (about 50 kilometers) per hour.
Read more: http://sputniknews.com/russia/20160430/1038879192/russia-corvette-engines.html#ixzz47If3y4wO
The Gremyashchy, a sophisticated new Russian naval ship, will be equipped with domestically made engines, according to the press service of the Russian Defense Ministry.
The Project 20385 Gremyashchy corvette will get the engines before the end of May 2015, according to the Ministry.
The Russian Navy had previously planned to equip the corvette with engines produced by the German company MTU. However, like dozens of other contracts with companies from countries which imposed sanctions against Russia in 2014, these plans were scrapped.
With the four engines due to be transported to the Gremyashchy by the end of May, the warship's state trials will begin in 2017, according to the Russian newspaper Rossiyskaya Gazeta.
This multi-role ship is being built at St. Petersburg's Severnaya Verf Shipyard; it is designed for antisubmarine and surface warfare as well as for supporting land operations. The vessel is made of composite materials and incorporates stealth technology, which has considerably reduced its radar and infrared signatures.
The Gremyashchy has a crew of 99 and is equipped with artillery, missile and anti-submarine weaponry, as well as an advanced radar sytem.
Its armaments include Kalibr-NK universal missiles, a Redut anti-aircraft missile system and a A-190-01 100mm gun. It also has a hangar for operating a Kamov Ka-27 antisubmarine warfare helicopter.
The 104-meter-long corvette has a full displacement of 2,200 metric tons and a maximum speed of 27 knots (about 50 kilometers) per hour.
Read more: http://sputniknews.com/russia/20160430/1038879192/russia-corvette-engines.html#ixzz47If3y4wO
George1- Posts : 18338
Points : 18835
Join date : 2011-12-22
Location : Greece
- Post n°280
Re: Project 2038.0: Steregushchy Corvette
Orders for the third of the Pacific Project 20380 corvette
According to information on the website of public procurement, PJSC "Amur Shipbuilding Plant" (ASP, Komsomolsk-on-Amur) is actively contracting systems and components for the construction of a third of the pledged at the plant for the Pacific fleet corvette project 20380 "Hero of Russia Aldar Tsydenzhapov" (serial number 2103).
Recall that the corvette project 20380 "Hero of Russia Aldar Tsydenzhapov" (serial number 2103) was laid on the July 22, 2015. At the same time held Neas closed request for prices to supply tripping devices for sonar system "Minotaur-M" SPU WSP-M appears a request for the supply of two sets of devices - not only for the construction of the corvette with the serial number 2103, and for the next Corvette with serial number 2104. Earlier media reported that the corvette tab with the serial number 2104 is scheduled for NEA on 1 July 2016 with the assignment of the ship name, "sharp".
Contracts for the construction of the corvette project 20380 with serial number 2103 on the NEA:
Technical support of construction and adjustment of the project design documentation
Almaz Central Marine Design Bureau
186,045 mln
Deadline - 25/11/2018 (it probable date of delivery of the order in 2103)
http://zakupki.gov.ru/223/purchase/public/purchase/info/documents.html?noticeId=3604923&epz=true&style44=false
Supply of gun mount AK-630M-06 - 2 sets.
Tulamashzavod
83,698 mln
term - 06.2017
http://zakupki.gov.ru/223/purchase/public/purchase/info/common-info.html?noticeId=3456280&epz=true&style44=false
Product Purchase 3S97.2K.00 - 1 set.
JSC "SDO"
400,181 mln
Term - 06.2017
http://zakupki.gov.ru/223/purchase/public/purchase/info/common-info.html?noticeId=3660615&epz=true&style44=false
MTPK Package Management System
AO SSPE Region
60,652 mln
Term - 10.2017
http://zakupki.gov.ru/223/purchase/public/purchase/info/common-info.html?noticeId=3689422&epz=true&style44=false
Supply of lowering and lifting device for the complex "Minotaur-M" SPU WSP M - 2 pcs
317,200 mln
http://zakupki.gov.ru/223/purchase/public/purchase/info/common-info.html?noticeId=3689472&epz=true&style44=false
Complex II-409, the antenna APS-6-3M, equipment BTS, connecting devices
Central Research Institute of Electric appliance
93,905 mln
term - 09.2017
http://zakupki.gov.ru/223/purchase/public/purchase/info/common-info.html?noticeId=3689492&epz=true&style44=false
Aggregate Supply diesel diesel 1DDA-12000 (06, 07).
Kolomna factory
626,387 mln
http://zakupki.gov.ru/223/purchase/public/purchase/info/common-info.html?noticeId=3576342&epz=true&style44=false
Diesel Generator-ADH 630K TU 24-02 - 4 pcs
UDMZ
290,178 mln
http://zakupki.gov.ru/223/purchase/public/purchase/info/common-info.html?noticeId=3037214&epz=true&style44=false
Screw propeller left and right rotation (2 pieces) Fairing propeller casting (3 pcs)
Baltic Shipbuilding Plant,
44,758 mln
http://zakupki.gov.ru/223/purchase/public/purchase/info/common-info.html?noticeId=3577058&epz=true&style44=false
Supply shafts
Zelenodolsk Plant named after Gorky
55,892 mln
http://bmpd.livejournal.com/1878489.html
According to information on the website of public procurement, PJSC "Amur Shipbuilding Plant" (ASP, Komsomolsk-on-Amur) is actively contracting systems and components for the construction of a third of the pledged at the plant for the Pacific fleet corvette project 20380 "Hero of Russia Aldar Tsydenzhapov" (serial number 2103).
Recall that the corvette project 20380 "Hero of Russia Aldar Tsydenzhapov" (serial number 2103) was laid on the July 22, 2015. At the same time held Neas closed request for prices to supply tripping devices for sonar system "Minotaur-M" SPU WSP-M appears a request for the supply of two sets of devices - not only for the construction of the corvette with the serial number 2103, and for the next Corvette with serial number 2104. Earlier media reported that the corvette tab with the serial number 2104 is scheduled for NEA on 1 July 2016 with the assignment of the ship name, "sharp".
Contracts for the construction of the corvette project 20380 with serial number 2103 on the NEA:
Technical support of construction and adjustment of the project design documentation
Almaz Central Marine Design Bureau
186,045 mln
Deadline - 25/11/2018 (it probable date of delivery of the order in 2103)
http://zakupki.gov.ru/223/purchase/public/purchase/info/documents.html?noticeId=3604923&epz=true&style44=false
Supply of gun mount AK-630M-06 - 2 sets.
Tulamashzavod
83,698 mln
term - 06.2017
http://zakupki.gov.ru/223/purchase/public/purchase/info/common-info.html?noticeId=3456280&epz=true&style44=false
Product Purchase 3S97.2K.00 - 1 set.
JSC "SDO"
400,181 mln
Term - 06.2017
http://zakupki.gov.ru/223/purchase/public/purchase/info/common-info.html?noticeId=3660615&epz=true&style44=false
MTPK Package Management System
AO SSPE Region
60,652 mln
Term - 10.2017
http://zakupki.gov.ru/223/purchase/public/purchase/info/common-info.html?noticeId=3689422&epz=true&style44=false
Supply of lowering and lifting device for the complex "Minotaur-M" SPU WSP M - 2 pcs
317,200 mln
http://zakupki.gov.ru/223/purchase/public/purchase/info/common-info.html?noticeId=3689472&epz=true&style44=false
Complex II-409, the antenna APS-6-3M, equipment BTS, connecting devices
Central Research Institute of Electric appliance
93,905 mln
term - 09.2017
http://zakupki.gov.ru/223/purchase/public/purchase/info/common-info.html?noticeId=3689492&epz=true&style44=false
Aggregate Supply diesel diesel 1DDA-12000 (06, 07).
Kolomna factory
626,387 mln
http://zakupki.gov.ru/223/purchase/public/purchase/info/common-info.html?noticeId=3576342&epz=true&style44=false
Diesel Generator-ADH 630K TU 24-02 - 4 pcs
UDMZ
290,178 mln
http://zakupki.gov.ru/223/purchase/public/purchase/info/common-info.html?noticeId=3037214&epz=true&style44=false
Screw propeller left and right rotation (2 pieces) Fairing propeller casting (3 pcs)
Baltic Shipbuilding Plant,
44,758 mln
http://zakupki.gov.ru/223/purchase/public/purchase/info/common-info.html?noticeId=3577058&epz=true&style44=false
Supply shafts
Zelenodolsk Plant named after Gorky
55,892 mln
http://bmpd.livejournal.com/1878489.html
|
|