+78
Dr.Snufflebug
Kiko
Scorpius
Lurk83
Russian_Patriot_
Yugo90
wilhelm
mr_hd
mnztr
LMFS
lyle6
Nomad5891
Backman
lancelot
PhSt
SeigSoloyvov
Rodion_Romanovic
owais.usmani
dino00
PapaDragon
Hole
miketheterrible
Walther von Oldenburg
Karl Haushofer
Isos
Admin
Dima
auslander
JohninMK
d_taddei2
Big_Gazza
ATLASCUB
Svyatoslavich
Singular_Transform
Rmf
Henrik5927
Kimppis
Project Canada
max steel
KiloGolf
par far
higurashihougi
Regular
OminousSpudd
NationalRus
KoTeMoRe
ExBeobachter1987
Maximmmm
Rodinazombie
zg18
Prince Darling
Neutrality
marat
Osobist
magnumcromagnon
whir
mack8
VladimirSahin
Cyberspec
KomissarBojanchev
Werewolf
kvs
Zivo
Viktor
Kyo
sepheronx
George1
medo
TR1
GarryB
TheArmenian
AlfaT8
collegeboy16
Firebird
Vann7
Flyingdutchman
flamming_python
runaway
82 posters
Crimea and ex-Ukrainian/Black Sea regions integration into RF
Scorpius- Posts : 1585
Points : 1585
Join date : 2020-11-06
Age : 37
GarryB, xeno and Hole like this post
franco- Posts : 7075
Points : 7101
Join date : 2010-08-18
In the new regions of Russia, 19 thousand objects were built and reconstructed in two years, Russian Deputy Prime Minister Marat Khusnullin said on May 17 following the plenary meeting of the International Economic Forum “Russia - Islamic World: KazanForum”.
“We are indeed working separately on the restoration of Donbass ; 19 thousand objects were built and reconstructed in two years. Today, all major federal customers, all regional bosses are working on new territories,” he said.
According to Khusnullin, the first task of the authorities was to restore the destruction.
“We have 2 thousand 400 km of roads built and restored,” he emphasized.
He called the second important step the speedy launch of the economy in new regions, as more jobs and a tax base will appear.
“We have created good conditions for mortgages and for the development of housing construction,” the Deputy Prime Minister noted.
Speaking about Mariupol, he noted that an embankment and a park will soon open in the city, the restoration of apartment buildings has been completed and houses will be built in the private sector.
In February, Russian Prime Minister Mikhail Mishustin announced that more than 18 thousand different objects had been restored in the Donbass , including 6.5 thousand residential buildings and social institutions.
In the same month, it was reported that more than 3.2 thousand electrical grid infrastructure facilities were restored in new regions, 199 wind turbines with a total capacity of 703.9 MW were launched, and 12 power units at four thermal power plants were repaired.
At the same time, Khusnullin said that in Mariupol it was possible to restore almost all residential buildings, and the heavily damaged city of half a million actually returned to life. About 40 thousand people are working on the restoration of various facilities (including residential and social) in new regions ; this is now the largest infrastructure project in the country.
https://iz-ru.translate.goog/1698319/2024-05-17/v-novykh-regionakh-za-dva-goda-postroili-i-rekonstruirovali-19-tys-obektov?main_click&_x_tr_sl=ru&_x_tr_tl=en&_x_tr_hl=en&_x_tr_pto=wapp
“We are indeed working separately on the restoration of Donbass ; 19 thousand objects were built and reconstructed in two years. Today, all major federal customers, all regional bosses are working on new territories,” he said.
According to Khusnullin, the first task of the authorities was to restore the destruction.
“We have 2 thousand 400 km of roads built and restored,” he emphasized.
He called the second important step the speedy launch of the economy in new regions, as more jobs and a tax base will appear.
“We have created good conditions for mortgages and for the development of housing construction,” the Deputy Prime Minister noted.
Speaking about Mariupol, he noted that an embankment and a park will soon open in the city, the restoration of apartment buildings has been completed and houses will be built in the private sector.
In February, Russian Prime Minister Mikhail Mishustin announced that more than 18 thousand different objects had been restored in the Donbass , including 6.5 thousand residential buildings and social institutions.
In the same month, it was reported that more than 3.2 thousand electrical grid infrastructure facilities were restored in new regions, 199 wind turbines with a total capacity of 703.9 MW were launched, and 12 power units at four thermal power plants were repaired.
At the same time, Khusnullin said that in Mariupol it was possible to restore almost all residential buildings, and the heavily damaged city of half a million actually returned to life. About 40 thousand people are working on the restoration of various facilities (including residential and social) in new regions ; this is now the largest infrastructure project in the country.
https://iz-ru.translate.goog/1698319/2024-05-17/v-novykh-regionakh-za-dva-goda-postroili-i-rekonstruirovali-19-tys-obektov?main_click&_x_tr_sl=ru&_x_tr_tl=en&_x_tr_hl=en&_x_tr_pto=wapp
GarryB, flamming_python, xeno, zardof and Hole like this post
flamming_python- Posts : 9685
Points : 9743
Join date : 2012-01-30
franco, ahmedfire, Firebird, Rodion_Romanovic, Hole, lancelot and Krepost like this post