http://www.sdelanounas.ru/blogs/45345/
+75
flamming_python
dino00
PhSt
hoom
The-thing-next-door
MiamiMachineShop
marcellogo
Gazputin
Hole
GunshipDemocracy
Labrador
verkhoturye51
kumbor
Rodion_Romanovic
mnztr
Luq man
Tingsay
T-47
DasVivo
Singular_Transform
Benya
miketheterrible
miroslav
walle83
PapaDragon
Isos
Big_Gazza
KomissarBojanchev
SeigSoloyvov
KiloGolf
Ned86
r3mu511
chicken
Rmf
AlfaT8
wilhelm
Dima
kvs
Book.
Mirlo
marat
JohninMK
sepheronx
George1
AyalaBotto
artjomh
franco
zidzu
Vympel
Cucumber Khan
ult
Honesroc
Battalion0415
T055
Mike E
Vann7
magnumcromagnon
Morpheus Eberhardt
navyfield
medo
xeno
Stealthflanker
Deep Throat
zg18
calripson
Austin
Viktor
TR1
TheArmenian
runaway
Cyberspec
GarryB
Robert.V
Admin
Russian Patriot
79 posters
Project 2038.0: Steregushchy Corvette
zg18- Posts : 888
Points : 958
Join date : 2013-09-26
Location : Zagreb , Croatia
- Post n°121
"Stoiky" began factory trials
"Stoiky" began factory trials
http://www.sdelanounas.ru/blogs/45345/
http://www.sdelanounas.ru/blogs/45345/
Viktor- Posts : 5796
Points : 6429
Join date : 2009-08-25
Age : 43
Location : Croatia
- Post n°122
Re: Project 2038.0: Steregushchy Corvette
Stoikiy successfully tested 9M96 (air defense)
Corvette "Resistant" successfully tested air defense and communication
There where some issues with this (reported in Almaz-Antey 2012 report) and Im glad this is over now
Corvette "Resistant" successfully tested air defense and communication
There where some issues with this (reported in Almaz-Antey 2012 report) and Im glad this is over now
Deep Throat- Posts : 86
Points : 112
Join date : 2013-05-22
- Post n°123
Re: Project 2038.0: Steregushchy Corvette
Viktor wrote:There where some issues with this (reported in Almaz-Antey 2012 report) and Im glad this is over now
Viktor , is it not possible to upgrade the 76mm or 127 mm Naval guns to 137mm or 155mm guns ?
BAE Systems is overhauling and upgrading two Mk 45 naval guns, bringing them to the 5-inch, 62-caliber Mk 45 Mod 4 configuration for US destroyers.
GarryB- Posts : 40103
Points : 40601
Join date : 2010-03-30
Location : New Zealand
- Post n°124
Re: Project 2038.0: Steregushchy Corvette
Viktor , is it not possible to upgrade the 76mm or 127 mm Naval guns to 137mm or 155mm guns ?
BAE Systems is overhauling and upgrading two Mk 45 naval guns, bringing them to the 5-inch, 62-caliber Mk 45 Mod 4 configuration for US destroyers.
That is what the hold up has been about... vessels that in the Soviet Navy would have been fitted with 76mm guns are getting 100mm guns and vessels that would have gotten 100mm guns are getting 130mm guns. Likely the vessels with 130mm guns (Destroyers and Cruisers like Sovremmeny and later model Kirovs) will likely get 152mm guns.
Deep Throat- Posts : 86
Points : 112
Join date : 2013-05-22
- Post n°125
Re: Project 2038.0: Steregushchy Corvette
GarryB wrote:That is what the hold up has been about... vessels that in the Soviet Navy would have been fitted with 76mm guns are getting 100mm guns and vessels that would have gotten 100mm guns are getting 130mm guns. Likely the vessels with 130mm guns (Destroyers and Cruisers like Sovremmeny and later model Kirovs) will likely get 152mm guns.
Hey thanx Garry . So , just to be clear are the 76 mm guns been upgraded to 100mm , 130 mm or are they replacing the 76mm with news 100 mm , 130 mm guns ?
GarryB- Posts : 40103
Points : 40601
Join date : 2010-03-30
Location : New Zealand
- Post n°126
Re: Project 2038.0: Steregushchy Corvette
Hey thanx Garry . So , just to be clear are the 76 mm guns been upgraded to 100mm , 130 mm or are they replacing the 76mm with news 100 mm , 130 mm guns ?
The corvettes that are the subject of this thread would have gotten an armament in Soviet times of a single 76mm gun and probably either two 30mm gatling turrets or perhaps a single turret and an SA-N-4 naval OSA equivalent and perhaps 4-6 large anti ship missiles like SS-N-22 Moskit.
Fitting a 100mm gun would have been out of the question because of the weight of the 100mm guns.
The Corvettes being made now will be fitted with 100mm guns that weigh about the same as the old 76mm gun but with a much heavier shell fired over much greater range, plus much more heavily armed in terms of other weapons and choices.
For instance the single UKSK launcher will allow it to carry 8 Onyx supersonic anti ship missiles, but could just as easily carry anti submarine missiles that deliver torpedoes to targets 40km away at mach 2.5, or land attack cruise missiles able to hit targets 2,500km away or any combination of these weapons.
They have developed new light weight 100mm and 130mm guns that are the weight of 76mm and 100mm guns respectively.
The new 152mm gun was developed with the Army and in the army it is entering service as the Koalition. It has an effective range of about 70km and has Glonass/laser guidance to allow precision targeting.
TR1- Posts : 5435
Points : 5433
Join date : 2011-12-06
- Post n°127
Re: Project 2038.0: Steregushchy Corvette
https://www.youtube.com/watch?v=QVgMgUk2V70
Great photos of the frigates on patrol! You can see the combat information center.
Great photos of the frigates on patrol! You can see the combat information center.
Stealthflanker- Posts : 1459
Points : 1535
Join date : 2009-08-04
Age : 36
Location : Indonesia
- Post n°128
Re: Project 2038.0: Steregushchy Corvette
TR1 wrote:https://www.youtube.com/watch?v=QVgMgUk2V70
Great photos of the frigates on patrol! You can see the combat information center.
Cool :3
TR1- Posts : 5435
Points : 5433
Join date : 2011-12-06
- Post n°129
Re: Project 2038.0: Steregushchy Corvette
http://www.flotprom.ru/news/?ELEMENT_ID=164194
What the.
The contract with Aur over 20380 construction had DOUBLE the price the MOD is paying for one ship. The first ship was for 6.5 billion rubles, now the contract is for 13 billion rubles.
Yes, you heard that right. For that sort of money Amur better turn into a magic yard.
And this isn't even for 20385!!!
What the.
The contract with Aur over 20380 construction had DOUBLE the price the MOD is paying for one ship. The first ship was for 6.5 billion rubles, now the contract is for 13 billion rubles.
Yes, you heard that right. For that sort of money Amur better turn into a magic yard.
And this isn't even for 20385!!!
xeno- Posts : 268
Points : 271
Join date : 2013-02-04
- Post n°130
Re: Project 2038.0: Steregushchy Corvette
Amur Shipyard has been totally ruined during past 20 years. MOD knows it very well and is actually rebuilding the shipyard(infrastructure and staff recruiting and training, etc).
BTW I would rather pay 400M dollars for a 20381 instead of a 11356M...
BTW I would rather pay 400M dollars for a 20381 instead of a 11356M...
sepheronx- Posts : 8761
Points : 9021
Join date : 2009-08-06
Age : 35
Location : Canada
- Post n°131
Re: Project 2038.0: Steregushchy Corvette
TR1 wrote:http://www.flotprom.ru/news/?ELEMENT_ID=164194
What the.
The contract with Aur over 20380 construction had DOUBLE the price the MOD is paying for one ship. The first ship was for 6.5 billion rubles, now the contract is for 13 billion rubles.
Yes, you heard that right. For that sort of money Amur better turn into a magic yard.
And this isn't even for 20385!!!
Well, if it comes with restructuring the facility, modernize it, and training staff, then I have to say it will be money well spent. If not, then wow.
Austin- Posts : 7617
Points : 8014
Join date : 2010-05-08
Location : India
- Post n°132
Re: Project 2038.0: Steregushchy Corvette
Looking at the way SY rips of money from MOD ......I am quite certain they wont be able to meet Navy SAP 2020 needs within alloted money ...... not to mentioned the economy problem does not help either.
Generally for production batches the cost is lower over lead ship but here is exactly the opposite.
Generally for production batches the cost is lower over lead ship but here is exactly the opposite.
TR1- Posts : 5435
Points : 5433
Join date : 2011-12-06
- Post n°133
Re: Project 2038.0: Steregushchy Corvette
TR1- Posts : 5435
Points : 5433
Join date : 2011-12-06
- Post n°134
Re: Project 2038.0: Steregushchy Corvette
http://bmpd.livejournal.com/821840.html#comments
First 20380 from Amur is expected at the earliest in late 2015.
So probably 2016.
First 20380 from Amur is expected at the earliest in late 2015.
So probably 2016.
xeno- Posts : 268
Points : 271
Join date : 2013-02-04
- Post n°135
Re: Project 2038.0: Steregushchy Corvette
So, finally 9M96 from 20381...
medo- Posts : 4343
Points : 4423
Join date : 2010-10-24
Location : Slovenia
- Post n°136
Re: Project 2038.0: Steregushchy Corvette
xeno wrote:
So, finally 9M96 from 20381...
So Redut now work normally as planed? I hope it will soon become operational.
calripson- Posts : 753
Points : 808
Join date : 2013-10-26
- Post n°137
Stoikiy
When is the Stoikiy supposed to be commissioned ? She has been in trials for a long time.
TR1- Posts : 5435
Points : 5433
Join date : 2011-12-06
- Post n°138
Re: Project 2038.0: Steregushchy Corvette
The superstructure of the lead 20835 ship, Gremyshy, is completed and being sent by barge to Severnaya.
http://www.wrk.ru/forums/attachment.php?item=389551&download=2&type=.jpg
http://www.wrk.ru/forums/attachment.php?item=389557&download=2&type=.jpg
http://www.wrk.ru/forums/attachment.php?item=389551&download=2&type=.jpg
http://www.wrk.ru/forums/attachment.php?item=389557&download=2&type=.jpg
TR1- Posts : 5435
Points : 5433
Join date : 2011-12-06
- Post n°139
Re: Project 2038.0: Steregushchy Corvette
http://www.wrk.ru/forums/attachment.php?item=389907&download=2&type=.jpg
Stoiky almost done.
Stoiky almost done.
TR1- Posts : 5435
Points : 5433
Join date : 2011-12-06
- Post n°140
Re: Project 2038.0: Steregushchy Corvette
calripson wrote:When is the Stoikiy supposed to be commissioned ? She has been in trials for a long time.
It has been handed over finally.
GarryB- Posts : 40103
Points : 40601
Join date : 2010-03-30
Location : New Zealand
- Post n°141
Re: Project 2038.0: Steregushchy Corvette
Generally for production batches the cost is lower over lead ship but here is exactly the opposite.
That really only applies to a shipyard ready for production.
In this case the shipyard was in poor condition and would scramble to build a ship properly.
Getting a second order wont help that much unless there is a profit padded in there to pay for infrastructure.
Very simply when you are paid to build something you work out materials and labour costs and use any profits to reinvest into the shipyard with new equipment, extra training and personnel.
When you are tragically underfunded you take the first money you are paid and try to pay off some debt so the subcontractors you need to build components will continue to work with you. You scrimp and scrape parts together at the lowest cost so you can invest more of the money into the infrastructure so future contracts can be tendered for.
the dramatic increase in price is likely largely for infrastructure and tooling and training costs which should lead to improved production performance without the scrimping and lead to the costs going down later and production speed increasing.
TR1- Posts : 5435
Points : 5433
Join date : 2011-12-06
- Post n°142
Re: Project 2038.0: Steregushchy Corvette
http://tvzvezda.ru/news/forces/content/201406020307-p0oe.htm#
Finally footage of Soobrazitelny firing Redut.
1.) You can clearly see its one tube per cell.
2.) Man that side thruster makes a hideous smoke.
Finally footage of Soobrazitelny firing Redut.
1.) You can clearly see its one tube per cell.
2.) Man that side thruster makes a hideous smoke.
navyfield- Posts : 118
Points : 69
Join date : 2013-05-27
- Post n°143
Re: Project 2038.0: Steregushchy Corvette
so just 12 redut missiles on that ship ?
TR1- Posts : 5435
Points : 5433
Join date : 2011-12-06
- Post n°144
Re: Project 2038.0: Steregushchy Corvette
navyfield wrote:so just 12 redut missiles on that ship ?
Yes, as I thought from the start.
It is a small ship, Redut is a pretty potent system on a corvette.
|
|